Page 12
background image

12.

Install the PINK with BLACK tracer blower relay harness wire (with a blade terminal) into cavity 43 of the 84-way connector (Figure 14 and
Figure 16).

13.

Install the BLUE wedge into the 84-way connector.

14.

Install the cover onto the rear of the 84-way connector.

15.

Connect the 84-way bulkhead connector.

16.

Disconnect the WHITE electrical connector on the blower relay harness. Install the PINK with BLACK tracer wire that was removed from the
84-way connector into the WHITE connector opening (Figure 16). Reconnect the WHITE connector. Secure the connector near the bulkhead
connector with a tie strap.

17.

Install the BLACK with ORANGE tracer blower relay harness wire into cavity 5 of the 7-way ignition switch connector (Figure 16).

18.

Disconnect the BLACK 2-way electrical connector on the blower relay harness (Figure 16). Remove the BLUE wedge and then install the BLACK
with ORANGE tracer wire that was removed from the ignition switch connector into cavity 2 of the BLACK connector. Install the wedge and
reconnect the BLACK 2-way connector. Secure the connector and any excess wiring near the base of the steering column with a tie strap.

19.

Cut off the terminal and then strip about 1" of wire insulation from the end of the DARK GREEN wire that was removed from the fuseblock
earlier.

20.

Strip about 1" of wire insulation from the end of the DARK GREEN with WHITE blower relay harness wire (Figure 16).

21.

Slide a piece of heat shrink tubing onto the wire.

22.

Connect the DARK GREEN and DARK GREEN with WHITE tracer wires by twisting the wire ends together.

23.

Solder the twisted wire ends using rosin core solder.

CAUTION:

Wire splice must be soldered. Do NOT use a solderless connector.

24.

Center the piece of heat shrink tubing over the splice. Heat the tubing with a heat source until sealant comes out each end of the tubing.

25.

Install the DARK GREEN blower relay harness wire into cavity 12 of the fuseblock (Figure 16).

26.

Install the PINK with BLACK tracer blower relay harness wire into cavity 11 of the fuseblock (Figure 16).

27.

Install the TAN fuseblock wedge (Figure 13).

28.

Reinstall the 30-amp fuse in the fuseblock F2 Blower Motor location (Figure 13).