dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Recall - Coil Spring Tower Reinforcements|Page 4672 > < Recall - Coil Spring Tower Reinforcements|Page 4670
Page 13
background image

1.

Grind the welds at the top of the roll stop brackets flush with the top of the bracket (Figure 12) to allow for proper fit of the spring tower
reinforcement bracket.

2.

Using a suitable hammer, flatten the area around the pilot pull hole on both sides of the frame rail if necessary (Figure 13).

3.

Prepare the welding surfaces by removing all wax, dirt, oil, and paint that may be present.

Recall - Coil Spring Tower Reinforcements|Page 4672 > < Recall - Coil Spring Tower Reinforcements|Page 4670