2500 4x4 Pickup L6-359 5.9L DSL Turbo (1995)
Inspecting Injector Operation
1. Loosen the high-pressure fuel line fitting at the injector.
2. Crank the engine until all air is bled from the line. Do not operate the starter motor for longer than 30 seconds. Wait two minutes between cranking
intervals.
3. Start the engine and bleed one injector at a time until the engine runs smoothly.
4. Tighten fuel line(s) at injector(s) to 30 Nm (22 ft lb) torque.