dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

All Technical Service Bulletins for Valve Cover Gasket: > < Cylinder Head - High Pitched Whistle at Idle
Page 2
background image

8.

After removal, transfer the existing head components (valves and valve springs) from the old head to the new head. Refer to Page 9-121.

9.

Install the new cylinder heads following the procedure given on Page 9-120.

10.

Install the fuel rail assembly as outlined on Page 14-80.

11.

Install the air cleaner assembly.

12.

Refill the cooling system.

13.

Connect the negative battery.

POLICY: Reimbursable within the provisions of the warranty.

TIME ALLOWANCE:

Labor Operation No:

09-35-01-99

6.9 Hrs.

Optional Equipment: 

09-35-01-64 Air Pump 

0.4 Hrs.

FAILURE CODE: P8 - New Part

All Technical Service Bulletins for Valve Cover Gasket: > < Cylinder Head - High Pitched Whistle at Idle