dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Fuel System - Vapor Lock|Page 51 > < Fuel System - Vapor Lock|Page 49
Page 6
background image

FIGURE 2-A - INSTRUMENT PANEL WIRING

5.

Connect the natural colored 1-way connector (on overlay harness, PN 4368642 to the loose natural colored 1-way connector that was
installed on the wire removed from cavity #30 of the instrument panel side of the bulkhead connectors in Step 3 (Figure 2-A).

6.

Route instrument panel overlay harness, PN 4368642, along the main instrument panel wiring harness and secure with three tie wraps, PN
6015756 (Figure 2-A).

FIGURE 2-C

Fuel System - Vapor Lock|Page 51 > < Fuel System - Vapor Lock|Page 49