Avenger L4-2.0L DOHC (1995)
Valve Body: Testing and Inspection
LR SOLENOID INSPECTION
1. Disconnect the solenoid & pressure switch assembly connector.
2. Measure the resistance between the solenoid & pressure switch assembly side connector terminals 4 and 6.
Standard value: Approx. 1 ohm [at 20°C (68°F)]
3. If the resistance is outside the standard value, replace the solenoid & pressure switch assembly.
2/4 SOLENOID INSPECTION
1. Disconnect the solenoid & pressure switch assembly connector.
2. Measure the resistance between the solenoid & pressure switch assembly side connector terminals 3 and 6.
Standard value: Approx. 1 ohm [at 20°C (68°F)]
3. If the resistance is outside the standard value, replace the solenoid & pressure switch assembly.
OD SOLENOID INSPECTION
1. Disconnect the solenoid & pressure switch assembly connector.
2. Measure the resistance between the solenoid & pressure switch assembly side connector terminals 6 and 8.
Standard value: Approx. 1 ohm [at 20°C (68°F)]
3. If the resistance is outside the standard value, replace the solenoid & pressure switch assembly.
UD SOLENOID INSPECTION
1. Disconnect the solenoid & pressure switch assembly connector.
2. Measure the resistance between the solenoid & pressure switch assembly side connector terminals 6 and 7.