Avenger V6-2.7L (2008)
12. Install left side lower chain guide (2) and tensioner arm (5). Tighten attaching bolts to 28 Nm (250 in. lbs.).
NOTE: Inspect O-ring on chain guide access plugs before installing. Replace O-ring as necessary.
13. Install chain guide access plugs to cylinder heads. Tighten plugs to 20 Nm (15 ft. lbs.).
NOTE: To reset the primary timing chain tensioner, engine oil will first need to be purged from the tensioner.
14. Purge oil from timing chain tensioner using the following procedure:
a. Place the check ball end of tensioner into the shallow end of Special Tool 8186.
b. Using hand pressure, slowly depress tensioner until oil is purged from tensioner.