Avenger V6-2.7L (2008)
INSTALLATION
NOTE: LHD Chrysler model shown in illustrations. Dodge and RHD models similar.
RIGHT FRONT FLOOR DUCT
NOTE: Illustration shown with instrument panel removed for clarity.
1. Connect the right floor duct (1) to the right side of the HVAC housing (2). Make sure the duct is fully engaged to the housing.
2. On LHD models, install the glove box bin See: Body and Frame/Interior Moulding / Trim/Glove Compartment/Service and Repair/Instrument
Panel Glove Box - Installation.
LEFT FRONT FLOOR DUCT
NOTE: Illustration shown with instrument panel removed for clarity.
3. Connect the left floor duct (1) to the left side of the HVAC housing (2). Make sure the duct is fully engaged to the housing.
4. Install the screw (4) that secures the left floor duct to the HVAC housing. Tighten the screw to 2 Nm (17 in. lbs.).
5. On LHD models, connect the shift interlock cable (3) to the left floor duct.