Avenger V6-2.7L (2008)
9. Start the upper starter bolt with ground cable.
10. Tighten bolt to 54 Nm (40 ft. lbs.).
11. Install mount through bolt (1) and tighten to 47 Nm (35 ft. lbs.).
9. Start the upper starter bolt with ground cable.
10. Tighten bolt to 54 Nm (40 ft. lbs.).
11. Install mount through bolt (1) and tighten to 47 Nm (35 ft. lbs.).