Avenger V6-2.7L (2008)
4. Connect input speed sensor connector (2).
5. Install solenoid/pressure switch 8-way connector and torque to 4 Nm (35 in. lbs.).
6. Install air cleaner assembly.
7. Connect battery negative cable.
8. If solenoid/pressure switch assembly was replaced, perform the "Quick-Learn" procedure See: Powertrain Management/Computers and Control
Systems/Testing and Inspection/Programming and Relearning/Quick Learn Procedure.