Avenger V6-2.7L Flex Fuel (2009)
Hydraulic Control Assembly - Antilock Brakes: Removal and Replacement
Hydraulic Control unit (HCU) - Installation
INSTALLATION
To install the HCU, assemble and install the ICU. See: Overhaul/Integrated Control Unit (ICU) - Assembly See: Integrated Control Unit (ICU) -
Installation
Integrated Control Unit (ICU) - Removal
2.7L/3.5L ENGINE
NOTE: Before proceeding, See: Service Precautions/Technician Safety Information See: Service Precautions/Vehicle Damage Warnings .
1. Disconnect and isolate battery negative cable from battery post.
2. Using a brake pedal holding tool as shown, depress the brake pedal past its first 25 mm (1 inch) of travel and hold it in this position. This will
isolate the master cylinder from the brake hydraulic system and will not allow the brake fluid to drain out of the master cylinder reservoir while the
lines are disconnected.
3. Remove the engine appearance cover.
4. Remove the engine upper intake manifold. See: Engine, Cooling and Exhaust/Engine/Intake Manifold/Service and Repair/Removal and
Replacement/Intake Manifold - Removal
5. Remove the primary (4) and secondary (1) brake tubes (from master cylinder) at the hydraulic control unit (7).
6. Remove the remaining brake tubes (2, 3, 5, 6) at the hydraulic control unit (7).