Avenger V6-2.7L Flex Fuel (2009)
6. If equipped with ESP(R), install the four screws (1) attaching the ABM (2) to the HCU. Tighten the mounting screws to 2 Nm (17 in. lbs.).
7. If necessary, install the mounting pins (1) in the ICU (2) and tighten to 11 Nm (97 in. lbs.).