dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Removal and Replacement|Page 7374 > < Removal and Replacement|Page 7372
Page 6
background image

4. Install the four chassis brake tubes (2, 3, 5, 6) brake tubes at the ICU hydraulic control unit (7). Tighten the tube nuts to 17 Nm (150 in. lbs.).
5. Install the primary (4) and secondary (1) brake tubes at the ICU hydraulic control unit (7). Tighten the tube nuts to 17 Nm (150 in. lbs.). 
6. Push the brake tube bundle routing clip (with tubes) onto the stud on the right side of the dash panel.
7. Install the engine upper intake manifold. See: Engine, Cooling and Exhaust/Engine/Intake Manifold/Service and Repair/Intake Manifold -

Installation

8. Remove the brake pedal holding tool.
9. Install the engine appearance cover.

10. Connect the battery negative cable to the battery post. It is important that this be performed properly. See: Starting and Charging/Battery/Service

and Repair/Procedures/Battery Reconnection

Removal and Replacement|Page 7374 > < Removal and Replacement|Page 7372