Caliber L4-2.0L VIN B (2007)
6. Install the instrument panel top cover.
CENTER DUCT
NOTE: LHD model shown. RHD model similar.
7. Position the center instrument panel duct (2) onto the top of instrument panel. Rotate and tilt the duct as necessary.
8. Install the two screws (3) that secure the center duct to the instrument panel support. Tighten the screws to 2.2 Nm (20 in. lbs.).
9. Install the left and right side instrument panel and demister ducts (1 and 2).