dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Tune-up and Engine Performance Checks > < Variable Valve Timing Solenoid - Removal|Page 2396
Page 3
background image

3. Install mounting bolt and tighten to 12 Nm (9 ft. lbs.).

4. Connect electrical connector to Variable valve timing solenoid.

5. Connect negative battery cable.

6. Install engine cover.

Tune-up and Engine Performance Checks > < Variable Valve Timing Solenoid - Removal|Page 2396