Caravan FWD L4-2.4L VIN B (1998)
Engine Mount: Service and Repair
Right Mount
REMOVAL
NOTE: Right mount should only be serviced as an assembly to prevent noise, vibration and harshness concerns.
1. Remove the purge duty solenoid and wiring harness from engine mount bracket.
Engine Mounting-Right Side
2. Remove the two right engine mount insulator vertical fasteners from frame rail and loosen the one horizontal fastener. Do not remove the large nut
located at the end of the core.
3. Remove the load on the engine mounts by carefully supporting the engine and transaxle assembly with a floor jack.
4. Remove the vertical and horizontal fasteners from the engine side bracket. Remove the mount assembly.
INSTALLATION
1. Reverse removal procedure for installation. Tighten assembly in the following order:
a. Engine mount to rail fasteners to 68 Nm (50 ft. lbs.).
b. The vertical engine fastener to 102 Nm (75 ft. lbs.).
c. The horizontal fastener to 150 Nm (111 ft. lbs.).