dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Variable Valve Timing > < Engine Timing Cover(s) - Removal|Page 1580
Page 2
background image

11. Install accessory drive belt tensioner assembly and both idler pulleys.
12. Install radiator lower hose.
13. Install both heater hoses.
14. Install the cooling module. 
15. Install the accessory drive belt.
16. Install the coolant bottle and washer bottle.
17. Install the upper radiator hose.
18. Install the air cleaner assembly.
19. Fill cooling system.
20. Refill engine oil.
21. Connect the battery negative cable.

Variable Valve Timing > < Engine Timing Cover(s) - Removal|Page 1580