Challenger SRT-8 V8-6.1L (2009)
14. Tighten the adjustment screw (5) to 7 Nm (65 in.lbs.).
15. Verify correct shifter operation.
16. If necessary, install the shield, covering the gearshift and park lock cables, to the floorpan and install the bolts to hold the shield to the floorpan.
17. Install the floor console See: Body and Frame/Interior Moulding / Trim/Console/Service and Repair/Floor Console - Installation , lower
instrument panel components See: Body and Frame/Interior Moulding / Trim/Dashboard / Instrument Panel/Service and Repair/Instrument Panel
Bezel - Installation and dash panel insulation pad as necessary.