Charger V6-2.7L (2008)
Electronic Brake Control Module: Service and Repair
Installation
INSTALLATION
1. Clean any debris off the mating surfaces of the HCU and ABM.
CAUTION: When installing new O-rings or solenoid valve stem seals, do not use any type of lubricant.
2. If the seals (1) on the solenoid valve stems (2) are not new, replace them all. Each of the solenoid valve stem seals must be new to keep out
moisture and debris; do not reuse solenoid valve stem seals.
3. Replace the pump/motor connector O-ring (1) if it is not new. Be sure the O-ring is properly seated in the mounting groove (2).