Charger V6-2.7L (2008)
6. Connect the electrical connector to EGR valve and lock.
7. Verify that no wiring harnesses or hoses are contacting the EGR tube.
8. Install purge solenoid to bracket.
9. Connect negative battery cable and tighten nut to 5 Nm (45 in. lbs.).