Charger V6-2.7L (2008)
3. Export Only - If servicing right upper control arm, connect headlamp leveling sensor (2) link at upper control arm (1).
4. Move shock assembly (3) allowing studs to be inserted through shock tower (2) mounting holes.
5. Place upper ball joint stud (1) through hole in top of knuckle and install nut (4). Tighten nut by holding ball joint stud with a hex wrench while
turning nut with a wrench. Tighten nut using crow foot wrench on torque wrench to 47 Nm + 90° turn (35 ft. lbs. + 90° turn).
6. Connect wheel speed sensor cable routing clip (2) at brake tube bracket (3).