dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Procedures|Page 7117 > < Procedures|Page 7115
Page 7
background image

3.   Position master cylinder (3) on studs of power brake booster, aligning booster push rod with master cylinder piston.
4.   Install two master cylinder mounting nuts (2). Tighten mounting nuts to 15 Nm (133 in. lbs.).

5.   Thread primary (3) and secondary (2) brake tubes into master cylinder primary and secondary ports. Tighten tube nuts to 20 Nm (177 in. lbs.).

6.   Connect wiring harness connector (4) to brake fluid level sensor (2) mounted in brake fluid reservoir (1).

Procedures|Page 7117 > < Procedures|Page 7115