Charger V6-3.5L (2009)
4. Position the upper turning loop (3) and install the retaining bolt (4). Torque bolt to 40 Nm (30 ft. lbs.).
5. Install the upper turning loop (3) trim cover (2).
4. Position the upper turning loop (3) and install the retaining bolt (4). Torque bolt to 40 Nm (30 ft. lbs.).
5. Install the upper turning loop (3) trim cover (2).