Charger V8-5.7L (2008)
4. Carefully install the spot lamp head with the intermediate and inner shafts to the outer tube and mounting bracket until the head assembly bottoms
out on the outer tube.
5. Tighten the clamp screw (1) at the base of the spot lamp head assembly in small increments while testing the effort required to rotate the spot lamp
between the stowed and operating positions. Stop tightening the clamp screw when the spot lamp can maintain any desired position.
6. Position the A-pillar trim to the spot lamp outer tube.
CAUTION: Support the head of the spot lamp while tightening the head assembly clamp screw. Maintain an operating or vertical
position.
7. Install the handle to the outer tube.
a. Position the spot lamp handle in the operating (downward close to vertical) position to the outer tube.
b. There are two detent positions to which the handle must line up and engage. Rotate the knob of the handle and the handle base to aid in