Charger SRT-8 V8-6.1L VIN W (2006)
4. Install pressure hose (2) to pump (1). Tighten pressure hose tube nut to 47 Nm (35 ft. lbs.) torque.
5. Install supply hose (3) on pump (1). Install clamp securing hose in place.
6. Install serpentine drive belt.
7. Install air cleaner housing and inlet tube.
8. Connect battery negative cable (2) to battery post. It is important that this is performed properly.
9. Fill pump reservoir with fluid and perform pump initial operation procedure.