Charger SRT-8 V8-6.1L VIN W (2006)
2. Place upper ball joint stud (1) through hole in top of knuckle and install nut (4). Tighten nut by holding ball joint stud with a hex wrench while
turning nut with a wrench. Tighten nut using crow foot wrench on torque wrench to 47 Nm + 90° turn (35 ft. lbs. + 90° turn) torque.
3. Connect wheel speed sensor cable routing clip (2) at brake tube bracket (3).
4. Install lower shock mounting bolt (3) attaching shock assembly (1) to lower control arm (4). Do not tighten bolt at this time.
5. Slide stabilizer link (3) ball joint stem into shock assembly from front. Install nut fastening link (3) to shock assembly (1). Tighten nut by holding
ball joint stud while turning nut. Tighten nut using crow foot wrench on torque wrench to 128 Nm (95 ft. lbs.) torque.