D50/Power Ram 50 V6-2972cc 3.0L SOHC (1990)
NOTE: BE SURE THE SYNCHRONIZER SPRINGS ARE POSITIONED AS SHOWN IN FIGURE 1.
5.
Install the 1-2 synchronizer assembly on the main shaft.
6.
Assemble and install the transmission as outlined in the appropriate service manual.
7.
Fill transmission with MOPAR 75W-90 Gear Lubricant PN 4549624 as outlined in the appropriate service manual.
NOTE: 75W-90 GEAR LUBRICANT MUST BE USED TO MAINTAIN COLD SHIFTABILITY.
POLICY:
Reimbursable within the provisions of the warranty.
TIME ALLOWANCE
Labor Operation No. 21-36-05-90
. . . . . . . . . .
6.2 Hrs.
> > FAILURE CODE: F3 - SYNCHRONIZER DEFECT 2ND < <