Dakota 2WD V6-239 3.9L Magnum (1996)
8. Tighten intake manifold bolts in sequence shown in Fig.11.
First, torque bolts 1 and 2 to 72 inch lbs. in alternating 12 inch lbs. steps,
then torque bolts 3 through 12 to 72 inch lbs.
Finally, torque all bolts to 12 ft. lbs.
9. Install closed crankcase ventilation and evaporation control systems.
10. Connect coil and heat indicator sending unit wires, then install heater and bypass hoses.
11. Install distributor cap and wires, then connect accelerator linkage, speed control and transmission kickdown cables.
12. Install fuel lines, fuel rail, alternator, serpentine belt and air cleaner.
13. Fill cooling system and connect battery ground cable.