dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Integrated Power Module (IPM)|Page 4434 > < Integrated Power Module (IPM)|Page 4432
Page 4
background image

4. Position the battery positive cable (4) and install the nut (5) onto the IPM B+ terminal stud (6). Install the IPM cover.
5. Connect the battery negative cable.
6. Confirm proper vehicle operation.

Integrated Power Module (IPM)|Page 4434 > < Integrated Power Module (IPM)|Page 4432