dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Positive Crankcase Ventilation > < EGR Valve - Removal|Page 3280
Page 2
background image

5. Position new gasket (3) between EGR tube flange and EGR valve assembly.
6. Position EGR tube (1) to side of EGR valve. Position end of tube (6) into intake manifold. Install two bolts (2). Torque to 11 Nm (8.5 ft. lbs.).

7. Connect electrical connector (3) to top of EGR valve solenoid (1).

8. Install EVAP canister purge solenoid (2) by slipping assembly to tongue-type bracket (1).
9. Connect negative battery cable.

10. Using a diagnostic scan tool, erase any previously recorded DTC's (Diagnostic Trouble Codes).

Positive Crankcase Ventilation > < EGR Valve - Removal|Page 3280