dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Coolant Line/Hose|Description and Operation|Page 950 > < Coolant Line/Hose|Description and Operation|Page 948
Page 5
background image

4. Install generator-A/C mounting bracket assembly to engine. Tighten bolts (number 1 and 2) to 54 Nm (40 ft. lbs.) torque. Tighten bolts (number

3) to 40 Nm (30 ft. lbs.) torque.

5. Install a new O-ring to the heater hose coolant return tube. Coat the new O-ring with antifreeze before installation.

6. Install coolant return tube and its mounting bolt to engine.
7. Connect throttle body control cables.

Coolant Line/Hose|Description and Operation|Page 950 > < Coolant Line/Hose|Description and Operation|Page 948