dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Charging System > < Battery Holddown|Page 4401
Page 2
background image

lbs.).

9. Install and tighten the one screw that secures the front of the battery tray to the front closure panel on the left side of the radiator yoke. Tighten the

screw to 12.4 Nm (110 in. lbs.).

10. Install the Power Distribution Center (PDC) onto the stanchions on the rear of the battery tray (Refer to POWER DISTRIBUTION CENTER -

INSTALLATION).

11. Install the battery onto the battery tray (Refer to BATTERY - INSTALLATION).

Charging System > < Battery Holddown|Page 4401