dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Voltage Inverter, Hybrid Drive > < Battery Pack Control Module - Removal
Page 1
background image

Hybrid Power Control Module: Service and Repair
Battery Pack Control Module - Installation

INSTALLATION

1. Install the battery pack control module mounting brackets on the battery pack control module. Tighten to 4.5 Nm (40 in. lbs.)
2. Install and connect the battery pack control module.
3. Install the positive contactor assembly See: Drive Motor Power Relay/Service and Repair/High Voltage Positive Contactor - Installation.
4. Install the current sensor See: Battery System, Hybrid Drive/Battery Current Sensor/Service and Repair/High Voltage Current Sensor - Installation

.

5. Install the high voltage battery cover See: Battery System, Hybrid Drive/Hybrid Battery Cover/Service and Repair/High Voltage Battery Cover -

Installation.

6. Perform the high voltage power up procedure .  See: Battery System, Hybrid Drive/Service and Repair/Battery System - High Voltage Power Up

Voltage Inverter, Hybrid Drive > < Battery Pack Control Module - Removal