dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Oil Intake Control Valve - Installation|Page 3941 > < Oil Intake Control Valve - Installation
Page 1
background image

Variable Valve Timing Solenoid: Service and Repair
Oil Intake Control Valve - Removal

REMOVAL

WARNING: On vehicles equipped with the high voltage system, you must thoroughly read and follow all High Voltage Safety procedures. In

addition, before performing any diagnostic or service procedure near a high voltage component, you must perform the High
Voltage Power Down. Failure to follow these instructions may result in possible serious or fatal injury 
See: Hybrid Drive
Systems/Battery System, Hybrid Drive/Service Precautions 

1. Perform the fuel system pressure release procedure See: Fuel Delivery and Air Induction/Fuel Filter/Fuel Pressure Release/Service and Repair 
2. Disconnect the 12 volt battery system ground isolation connector (1) located next to the electric vacuum pump (2).
3. Perform the HEV high voltage power down procedure   See: Hybrid Drive Systems/Battery System, Hybrid Drive/Service and Repair/Battery

System - High Voltage Power Down

4. Remove the intake manifold See: Engine, Cooling and Exhaust/Engine/Intake Manifold/Service and Repair/Removal and Replacement/Intake

Manifold - Removal 

5. Disconnect the oil control valve (OCV) electrical connector (2).
6. Remove the OCV fastener (1).

Oil Intake Control Valve - Installation|Page 3941 > < Oil Intake Control Valve - Installation