Durango 2WD V8-5.7L Hybrid (2009)
1. Connect solenoid wire to starter motor (snaps on).
2. Position battery cable to solenoid stud. Install and tighten battery cable eyelet nut to 25 Nm (19 ft. lbs.). Do not allow starter motor to hang from
wire harness.
3. Position starter motor (1) to engine.
4. If equipped with automatic transmission, slide cooler tube bracket into position.
5. Install and tighten both mounting bolts (2) to 68 Nm (50 ft. lbs.).
6. Lower vehicle.
7. Connect negative battery cable.