dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Module-Integrated Power|Page 7590 > < Module-Integrated Power
Page 2
background image

2. Connect the electrical connectors to the IPM (1).

3. Install the IPM to the retaining bracket.

4. Install the B+ cable and nut on the IPM B+ terminal. Snap the cover in place.

5. Connect the negative and positive battery cables.

Module-Integrated Power|Page 7590 > < Module-Integrated Power