dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Dodge Truck Grand Caravan V6-201 3.3L (1994)|Fluids > < Hose/Line HVAC|Removal and Installation|Page 1298
Page 1
background image

Hose/Line HVAC: Service and Repair
Rear Air Conditioning Lines

REMOVAL

WARNING: THE REFRIGERANT SYSTEM MUST BE EMPTY BEFORE PERFORMING THE FOLLOWING OPERATION.

1. Hoist the vehicle. Disconnect two tube-fittings from the engine compartment plumbing.

2. Remove the bolt from the unified plumbing block (left side of car, outboard of rail, forward of fuel tank).

3. Carefully pull refrigerant line assembly down (take care NOT to scratch the sealing surface with the tube pilots). Remove and discard the

aluminum gasket and cover unit sealing surface to prevent contamination.

4. Remove two screws holding plumbing to the fuel tank support and left-side support rail (near muffler support bracket).

5. Remove two screws holding the plumbing to the floor pan.

6. Disconnect the parking brake system at hook above muffler and the cable connection near the support rails.

7. Fish the nylon tubing and unified plumbing block above the muffler support member.

8. Lower the plumbing from the vehicle.

9. Measure the residual oil in the under body plumbing out of each end of the plumbing. The lowside (larger diameter line) has a check valve that can

restrict oil flow from the tube-fitting to the unified plumbing end of the hose. Measure clean R134a PAG refrigerant oil to be returned to the 
refrigerant system.

INSTALL

1. Protect the plumbing ends from scratches. If plumbing is new, do not remove the shipping caps until joining together.

2. Reverse the preceding steps from the REMOVAL procedure.

3. New gaskets and O-rings are required for installation. The O-rings must be covered with clean refrigerant oil prior to installation.

4. Connect the tube-fittings to the engine compartment under body plumbing. Avoid misalignment of the threads (cross threading) and tighten to 200

in-lbs

5. Remove the shipping cap from the plumbing side sealing surface and verify that the aluminum gasket is present.

6. Carefully align the pilot tubes of the plumbing line block into the unit (take care not to scratch the sealing surface).

7. Install the bolt through the plumbing plate into the unit sealing plate. Tighten bolt to 200 +/- 30 in lbs (23 +/- 3 Nm).

Dodge Truck Grand Caravan V6-201 3.3L (1994)|Fluids > < Hose/Line HVAC|Removal and Installation|Page 1298