Grand Caravan V6-3.3L VIN E Flex Fuel (2007)
INSTALLATION
Figure 1 O-ring Location
1. Verify O-ring (2) (Figure 1)is installed into position.
2. Install and tighten output speed sensor (1) to 27 Nm (20 ft. lbs.).
INSTALLATION
Figure 1 O-ring Location
1. Verify O-ring (2) (Figure 1)is installed into position.
2. Install and tighten output speed sensor (1) to 27 Nm (20 ft. lbs.).