Grand Caravan V6-3.3L VIN E Flex Fuel (2007)
1. Slide inner CV joint seal boot retaining clamp, onto the interconnecting shaft. Then, slide the replacement inner CV joint sealing boot (1) (Figure
1) onto the interconnecting shaft (4). Inner CV joint seal boot MUST be positioned on interconnecting shaft so the raised bead on the inside
of the small diameter end of the seal boot is in mating groove on interconnecting shaft.
Figure 2 Spider Assembly Installation on Interconnecting Shaft
2. Install spider assembly (1) (Figure 2) onto interconnecting shaft (2). Spider assembly must be installed on interconnecting shaft far enough to fully
install spider retaining snap-ring.
Figure 3 Installing Spider Assembly on Interconnecting Shaft