Grand Caravan V6-3.8L VIN L (2007)
FRONT HOSES
1. Connect the new drain hose to the sunroof housing and test drainage(Figure 1).
2. Install headliner.
3. Install sunroof opening trim lace.
4. Connect the control switch wire connector and install control switch.
5. Verify sunroof operation and alignment.
REAR HOUSING HOSE
1. Connect the new drain hose to the sunroof housing and test drainage (Figure 1).
2. Install headliner.
3. Install sunroof opening trim lace.
4. Connect the control switch wire connector and install control switch.
5. Verify sunroof operation and alignment.
Figure 1 SUNROOF ASSEMBLY