dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Diagram Information and Instructions|Page 3397 > < Diagram Information and Instructions|Page 3395
Page 13
background image

Installation

INSTALLATION

1.   Insert the removed terminal in the same cavity on the repair connector.
2.   Repeat steps for each terminal in the connector, being sure that all wires are inserted into the proper cavities. For additional connector pin-out

identification, refer to the wiring diagrams.

3.   When the connector is re-assembled, the secondary terminal lock must be placed in the locked position to prevent terminal push out.
4.   Replace dress cover (if applicable).
5.   Connect connector to its mating half/component.
6.   Connect battery and test all affected systems.

Removal

REMOVAL

1.   Disconnect the battery.
2.   Locate the diode in the harness, and remove the protective covering.
3.   Remove the diode from the harness, pay attention to the current flow direction (Figure 1).

Figure 1 DIODE IDENTIFICATION

Installation

INSTALLATION

1.   Remove the insulation from the wires in the harness. Only remove enough insulation to solder in the new diode.
2.   Install the new diode in the harness, making sure current flow is correct. If necessary, refer to the appropriate wiring diagram for current flow

(Figure 1).

3.   Solder the connection together using rosin core type solder only.  Do not use acid core solder.
4.   Tape the diode to the harness using electrical tape. Make sure the diode is completely sealed from the elements.
5.   Re-connect the battery and test affected systems.

Diagram Information and Instructions|Page 3397 > < Diagram Information and Instructions|Page 3395