Intrepid V6-3.2L VIN J (1998)
8.5 L (9 quarts) to refill the system.
NOTE:
COOLING SYSTEM FILL PROCEDURES ARE CRITICAL TO OVERALL COOLING SYSTEM PERFORMANCE.
15.
Operate the engine at 2000 to 2300 RPM for 20 minutes. This will remove any remaining air from the cooling system. The DRB Ill® can be used
to set the engine RPM within engine actuators, RPM set. Periodic monitoring of this procedure is necessary since the actuator test will time out in
5 minutes. The reset feature can be used to continue the engine RPM actuator feature.
NOTE:
DO NOT EXCEED 2500 RPM DURING THE AIR PURGE PROCEDURE.