dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

A/C Discharge Hose/Line Replacement|Page 6548 > < A/C Discharge Hose/Line Replacement|Page 6546
Page 2
background image

High pressures are produced in the refrigerant system when the air conditioning compressor is operating. Extreme care must be exercised to make sure
that each of the refrigerant system connections is pressure-tight and leak free. It is a good practice to inspect all flexible hose refrigerant lines at least
once a year to make sure they are in good condition and properly routed.

1. Place the liquid line in the vehicle.
2. Install the liquid line fitting to the receiver drier. Tighten the fastener to 13.6 Nm (10 ft. lbs.).
3. Install the liquid line mounting clamp fastener located near the service port. Tighten the fastener to 6.8 Nm (5 ft. lbs.).
4. Install the liquid line fastener at the condenser. Tighten the fastener to 23 Nm (17 ft. lbs.).
5. Connect the receiver/drier bracket fastener and the bracket to the strut panel.
6. Install the the short receiver/drier to evaporator line. Tighten the fastener to 13.6 Nm (10 ft. lbs.).
7. Connect the a/c line to the expansion valve. Tighten the retaining bolt to 23 Nm (17 ft. lbs.).
8. Install the engine air inlet tube and the air distribution duct on vehicles equipped with 3.2/3.5 L engines.
9. Evacuate the refrigerant system. Refer to:  Heating and Air Conditioning, Service and Repair, Refrigerant System Evacuate, See: Service and

Repair/Refrigerant System Evacuate

10. Charge the refrigerant system. Refer to:  Heating and Air Conditioning, Service and Repair, Refrigerant System Charge, See: Service and

Repair/Refrigerant System Charge

A/C Discharge Hose/Line Replacement|Page 6548 > < A/C Discharge Hose/Line Replacement|Page 6546