dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Campaign - Engine Connecting Rod Bearing Debris|Page 1855 > < Campaign - Engine Connecting Rod Bearing Debris|Page 1853
Page 23
background image

5.

Remove the cowl grill (Figure 32).

6.

Remove the strut tower structural bar attached to the right and left strut tower (Figure 32).

7.

Remove the engine air inlet filter box.

8.

Remove the tube connecting the air filter box to the throttle body.

9.

Remove the Positive Crankcase Ventilation hose.

10.

Remove the EGR tube.

11.

Remove the brake booster and other vacuum lines from the intake manifold.

12.

Disconnect the electrical harness from throttle body.

13.

Disconnect the electrical lead to the MAP sensor.

14.

Remove the upper intake plenum from the engine, its brackets and pencil braces.

15.

Remove the engine foam silencer pad from the top of the engine.

16.

Disconnect the electrical connections to the generator.

17.

Remove the generator.

18.

Place disposable towels underneath the fuel line disconnect at the engine. 

19.

Disconnect the fuel line at the engine disconnect.

20.

Cap the fuel supply line opening.

21.

Cap the engine fuel line opening.

22.

Remove the radiator cap, drain the engine coolant and save for reuse.

23.

Discharge the air conditioning system using an appropriate refrigerant recovery system.

24.

Disconnect the left oxygen sensor from the engine wiring harness.

25.

Disconnect the left side ground strap assembly on the left engine valve cover and at the cylinder head.

26.

Disconnect the right side oxygen sensor from the engine electrical harness. 

27.

Disconnect the engine harness from the IP chassis harness.

Campaign - Engine Connecting Rod Bearing Debris|Page 1855 > < Campaign - Engine Connecting Rod Bearing Debris|Page 1853