dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Campaign - Engine Connecting Rod Bearing Debris|Page 1808 > < Campaign - Engine Connecting Rod Bearing Debris|Page 1806
Page 31
background image

161. Install the EGR tube into the intake manifold (Figure 38).

162. Align the EGR tube and tighten the flange bolts at the intake manifold to 95 in. lbs. (11 N.m).

163. Tighten the two EGR tube bolts at the EGR valve to 95 in. lbs. (11 N.m).

164. Install PCV hose.

165. Install the engine air inlet filter box.

166. Install the connecting tube between the air inlet filter box and the throttle body.

167. Install the strut tower structural bar to the right and left strut towers.

168. Install cowl grill.

169. Install cowl grill push pins.

170. Inspect the dipstick tube "O" ring for damage. If damaged, install a new "O" ring (PN 05003905AA).

171. Install the dipstick tube into the oil pan.

172. Install the dipstick tube mounting bolt and tighten to 30 ft. lbs. (41 N.m).

173. Install the generator upper support bracket to the generator. Tighten the generator bolt to 48 ft. lbs. (65 N.m) and the engine block bolt to 40 ft.

lbs. (54 N.m).

174. Install the engine dipstick.

175. Install six new quarts of 10W30 engine oil.

176. Install coolant into the cooling system.

177. Install radiator cap.

178. Connect the battery.

179. Verify the seating of the cargo floor panel.

180. Start the vehicle and inspect for leaks.

181. Evacuate and charge the air conditioning system.

182. Return vehicle to the customer.

Campaign - Engine Connecting Rod Bearing Debris|Page 1808 > < Campaign - Engine Connecting Rod Bearing Debris|Page 1806