dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Curtain Airbag|Page 6191 > < Curtain Airbag|Page 6189
Page 4
background image

4. Install the screws (1) that secure the curtain airbag to the spring nuts in the roof side rail. Torque screws to 5 N.m (44 in.lbs.).

5. Connect the curtain airbag squib connector (2) to the inflator (3).
6. Install the headliner into the vehicle.

WARNING:  DO NOT CONNECT THE BATTERY NEGATIVE CABLE. PERSONAL INJURY OR DEATH MAY RESULT IF THE
SYSTEM TEST IS NOT PERFORMED FIRST
.

Curtain Airbag|Page 6191 > < Curtain Airbag|Page 6189