dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Left Side Module|Page 787 > < Left Side Module|Page 785
Page 7
background image

4. Connect the electrical connectors for right side fuel level sending card, left side module card and fuel pump.

5. Install module and align marks on the module for proper orientation.

6. Install module lock-ring.
7. Use special tool #9340 to tighten left side module lock ring.
8. Connect the electrical connector to left side module and install plastic access cover.

Left Side Module|Page 787 > < Left Side Module|Page 785