dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Shift Cable, A/T|Testing and Inspection|Page 3772 > < Shift Cable, A/T|Testing and Inspection|Page 3770
Page 3
background image

4. Install the gearshift cable (1) onto the shift lever pin (3).
5. Loosen the cable adjustment screw (5), if necessary.

6. From under the hood, route the gearshift cable (1) forward of the air conditioning lines and the heater hoses (2) and toward the transmission (3)

manual lever.

7. Raise vehicle.
8. Verify that the transmission is in the PARK position by trying to rotate the propeller shaft. If the propeller shaft rotates, move the transmission

manual shift lever to the full rearward position and turn the propeller shaft until the PARK system is engaged.

9. Route the gearshift cable (1) through the mounting bracket (2).

10. Engage the gearshift cable (1) eyelet onto the transmission manual shift lever (3).
11. Lower vehicle.
12. Verify that the shifter is in the PARK position.

Shift Cable, A/T|Testing and Inspection|Page 3772 > < Shift Cable, A/T|Testing and Inspection|Page 3770