Neon L4-2.0L SOHC (1995)
8. Lift door glass upward and out of opening at top of door.
9. Remove front guide plate from door glass.
INSTALLATION
1. Install front guide plate to door glass.
2. Carefully lower door glass through opening in top of door.
3. Position rear guide plate onto door glass and install bolts.
4. Install nuts holding regulator lift channel to door glass.
5. Tighten all door glass fasteners.
6. Tighten window inner belt stabilizer.
7. Install inner and outer door belt weatherstrips.
8. Install door trim panel and water shield.