Neon L4-2.0L SOHC (1995)
TIME ALLOWANCE:
Labor Operation No:
**21-75-32-93** Throttle Press. Cable, Adj. &
Road Test
0.4 Hrs.
FAILURE CODE:
XX - Service Adjustment
TIME ALLOWANCE:
Labor Operation No:
21-75-32-91
Throttle Press. Cable, Adj. & Road Test,
Replace Kickdown Bracket Adj. Throttle Press. Cable & Road
Test
1.0 Hrs.
21-75-32-92
Throttle Press. Cable, Adj. & Road Test,
Replace Kickdown Bracket & Valve Body Adj. Throttle Press.
Cable & Road Test 2.5 Hrs.
FAILURE CODE:
P8 - New Part